Cambridge Museum of Technology is thrilled to announce a major redevelopment of the Engineers House site will start on 10 November 2025 and should be completed in early 2026. During this period there will be some disruption which we hope to minimise.
A temporary toilet block will be sited in the bicycle parking area as the toilet block in the grounds of the Engineers House will not be accessible during this period.
Calverleys (bar) and Scotts (pizza) will continue to operate from the inside of the Engineers House until the new development is completed.
KK will continue to operate as normal throughout this period.